VTS goes in tomorrow............

  1. #1
    Doing it myself and with a friend. Wish us luck
  2. #2
    good luck mate plan on getting it done in a day ??
  3. #3
    takes about 12 hours work if your doing it on the drive inc tea and food breaks . quicker with a lift.
  4. #4
    Quote:
    Originally Posted by williamsvts View Post
    takes about 12 hours work if your doing it on the drive inc tea and food breaks . quicker with a lift.

    for an expert like you maybe
  5. #5
    Got a lift, prefer coffee tbh. I really hope it goes in in a day. I have never attempted anything like this before, so i have everything crossed. Eyes..... the lot anyone wanna come help us do it ?
  6. #6
    I have just finished mine !!! started it sunday at like 9.30 am and finished at 7pm but that was with an engine craine !! and a friend. If u have any problems or need a part if you break anything just drop me a PM !!

    i have basially 2 of everything !!

    good luck !
  7. #7
    good luck! hope it all goes well
  8. #8
    good luck mate, keep uz posted
  9. #9
    good luck mate any idea for the costs ?
  10. #10
    good luck mate
  11. #11
    You done this yet mate ???

    hows things going ?
  12. #12
    Yeah good luck mate!
    Me prefer coffee to
  13. #13
    Engines not even in the yet no real problems as such. I just really dont understand the wiring looms. The main problem is that i have two multi plugs on the gti loom but only one on the car dunno how to get round this.